January 10, 2017, a circular was issued by the Hydraulic Engineer Dept. as per Water for All Policy of MCGM.
January 16, 2019, Wadala Transit Camp got its first official water connection.
January 10, 2017, a circular was issued by the Hydraulic Engineer Dept. as per Water for All Policy of MCGM.
January 16, 2019, Wadala Transit Camp got its first official water connection.